1.Company profile
Sichuan Sohaipu Isostatic Press Technology Equipment Co., Ltd. was founded in 2005. It is a leading manufacturer dedicated to research, development and manufacture of cold isostatic presses. We are famous for its efficient R&D and technological breakthroughs.
Our company has large-scale mechanical production capacity, with 5-meter vertical lathe, 2*10-meter horizontal lathe, 2.5x6.5 CNC gantry milling machine and other large-scale mechanical equipment, using advanced strand technology, cold stability, long life. Guarantee isostatic pressure.
2.Product Description
At present, cold isostatic press has been widely used in industrial ceramics pressure forming, high temperature refractories, cemented carbides, permanent magnets, rare metal powder forming and other fields, occupying a considerable market share. Up to now, we have provided more than 500 sets of isostatic presses to the Chinese and international markets. All our products have passed the CE certification with PED clause issued by the European Union. Export countries or regions include Brazil, Russia, Europe, India, Taiwan and etc..
3.Product Parameters
1 |
Equipment Name: |
Cold Isostatic Press |
2 |
Equipment type: |
CIP200/300-300
|
3 |
Maximum pressure: |
300MPa |
4 |
The effective inner diameter of suppress cylinder vessel: |
Ø 200mm
|
5 |
The effective inner height of suppress cylinder vessel: |
300mm |
6 |
Pressing system Working medium : |
emulsion
|
7 |
Pressing system driving medium : |
L-HM32 anti-wear hydraulic oil |
8 |
No working parts pressure rising time: |
0~300MPa,t≤ 3min
|
9 |
Assistant time: upper plug close+ frame move in: |
t≤ 1.5min |
|
Assistant time: upper plug open+frame remove : |
t≤ 1.5min |
10 |
pressure hold time : |
0~9999s Setting freely |
11 |
pressure falls during pressure holding : |
hold 30min,falls≤2% (pressure setable self-compensation automatically ) |
12 |
Control mode: |
PLC(Siemens)+HMI(MCGS) / Automatic and Manual mode |
13 |
Supercharging mode: |
one - time supercharger , gradable pause |
14 |
Pressure relief mode: |
Automatic pressure relief, gradable pause |
15 |
Loading mode: |
the upper plug drives the feeding cage to move |
16 |
Certificate: |
By CE Certificated with PED directive |
17 |
Install Way: |
on floor |
18 |
Power Supply system: |
50Hz, 380V, Three-phase five wire system |
19 |
Working condition: |
- 0 ºC~ 45 ºC, Relative Humidity not more than 90%
|
20 |
Install Power : |
≈ 15 kw |
21 |
Install area: |
≈ 6-8 square meter |
22 |
Running noise: |
≤ 75dB |
S.NO. |
Type |
Diameter of Pressure
Vessel |
Height of Pressure
Vessel |
Maximum Isostatic
Pressure |
1 |
CIP 200/300-300 |
200mm |
300mm |
300Mpa |
2 |
CIP 200/1000-300 |
200 mm |
1000mm |
300Mpa |
3 |
CIP 420/4000-320 |
420mm |
4000mm |
320Mpa |
4 |
CIP 500/1200-400 |
500mm |
1200mm |
400Mpa |
5 |
CIP 500/1500-300 |
500mm |
1500mm |
300Mpa |
6 |
CIP 710/2000-250 |
710mm |
2000mm |
250Mpa |
7 |
CIP 1000/3500-200 |
1000mm |
3500mm |
200Mpa |
a. The vessel inner materials is 34CrNi3MoV alloy whole parts forged and then The forged vessel be wire wounded by alloy of wire(65Mn steel 1.5mm x 6mm size) as per the designed.
b.Whole procedure of the
cold isostatic pressing (CIP) machine, increasing, holding and releasing pressure is controlled by PLC and also there is a decompression system to protect the system over pressure to keep the machine in safety running.
4.Equipment Composition
The equipment consists of four parts: Suppression system, hydraulic system, filling and pumping system and electrical control system.
5.About Acceptance
acceptance method
5.1 after finish the manufacturing of the press machine, the test production to be proceeded in the Seller's workshop.
5.2 During test production, The Buyer have the right to send people to the Seller for on-site supervision, inspection, verifying all issues including inspection records, debugging records, final inspection reports or other necessary documents for examination and approval to carry out the pre-acceptance.
5.3 After the seller complete the installation and commissioning at the designated location, the final acceptance approved.
6.We and Our Customers
7.After Sales Service
1. Within the warranty period, we shall immediately reply and guide troubleshooting within 1 hour after receiving the buyer's equipment failure notice. If it cannot be solved, we shall arrive at the buyer's production site for maintenance and troubleshooting within 24 hours.
2. We shall provide major and medium-sized equipment repair services, spare parts and wearing parts services in a long-term preferential manner. Provide technical support and quality tracking for the use of equipment for life.
3. Be responsible for equipment installation and debugging until it passes the acceptance.
4. We
shall train the buyer's maintenance workers and operators free of charge.The training is divided into two parts: theoretical training and practical training.
The training shall be conducted in two times. The first time, theoretical and practical training shall be conducted during the general assembly, debugging and pre-acceptance at our production site for one week; For the second time, the maintenance and operation training shall be conducted from the whole process of hoisting, installation, debugging and acceptance at the buyer's installation site.
2 ~ 3 equipment operators shall be trained free of charge. The training content includes: equipment operation, use, daily maintenance, etc., so that the trainees can operate the equipment independently.
5. We shall be responsible for the effect and quality of the training. If the training provided cannot meet the requirements, the buyer has the right to require retraining or extend the training time by itself.
8.Our Certification
9.1 Within 15 days after this agreement comes into force, party B shall submit to party A the outline drawing of the equipment and the basic drawing of installation;
9.2 it is total Four months for equipment design, outsourcing procurement, manufacturing, assembly and in-plant commissioning;
9.3 According to the requirements of the contract, the supplier shall complete the installation and debugging of the equipment within 5 days after the arrival of the goods.
Sichuan Suohaipu Isostatic Pressing Technology and Equipment Co., Ltd. is a professional and leading manufacturer in design and producing Isostatic Press Machine, including Cold Isostatic Press(CIP), Warm Isostatic Press(WIP) and Hot Isostatic Press(HIP). Up to now, we have supplied more than 500 sets of the presses to the market.
We have always insisted on technological innovation, obtained dozens of invention patents and utility patents, and formed a complete series of cold isostatic pressing process products, with strong technical backbone, which can quickly meet the special requirements of customers.
We sincerely hope to establish long terms business relations with customers worldwide in the line. Warmly welcome your inquiries, any ideas or suggestions, please feel free to contact us. Your attention and interests to our products would be fully appreciated.
Contact Us
Marketing Manager: |
George Sun |
Website: |
chinasun99.en.made-in-china.com |
Address: |
88# Zhujiang Road,Nanjing,Jiangsu,China |